Projects
CONTACT US
+1 317-459-1836
Project Cost Guide: What to Expect for Your Renovation
Anna, Thadeus’s wife, always has home renovations on her mind that she mentions she would like us to do (this might be familiar for some of you as well). She will very casually mention she wants to add a second story deck which gives him a slight heart attack as we are talking multiple thousand if not tens of thousands of dollars depending on material and complexity!!! She isn’t aware of what it costs though, it isn’t common
knowledge for most people. So below We have made a cheat sheet for the most common remodeling and renovations jobs we do, so you too are aware of what a project might cost!
With over 30+ years of construction and 10+ years of general contracting experience we are your go to construction experts. We know you want to know what a project costs and before we use your valuable time, take a look at jobs below!
Bathroom Remodel
A bathroom remodel starts between $15,000 to $25,000 (less than 80 sq ft footprint).
The project length is typically 2-3 weeks.
– Demo to a white box state (removal of everything except dry wall)
– Minor movement of electrical, plumbing, and/or HVAC
– Tub/shower replaced
– Vanity replaced
– Basic tile surround (labor provided)
– Flooring Replaced (LVP)
– Trim replaced
– Toilet, faucet, and shower head replaced
– Paint
Bathroom Renovation
A bathroom remodel starts between $35,000 to $75,000 (greater than 100 sq ft footprint typ.).
The project length is typically 3-4 weeks.
– Demo to a white box state (Removal of everything except dry wall)
– Removal of walls and adding new
– Major movement of electrical, plumbing, and/or HVAC (i.e. add a freestanding
tub, add additional lighting, switch out exhaust fans)
– Tile tub/shower surround with niches (specialty patterns included- chevron,
herringbone, stacked, sealing of natural stone, etc.)
– Vanity replaced
– Toilet, faucet, showerhead replaced
– Trim replaced
– Wall paneling, wainscotting, accent walls, crown molding
– Paint
– Glass shower door install
– 3D Design
– Work with Designer
Kitchen Remodel
A kitchen remodel starts between $33,000 to $50,000.
The project length is typically 3-5 weeks.
-Demo to a white box state (only dry wall remaining)
– Existing footprint stays the same
– Cabinets replaced (plywood constructed)
– Replace countertops
– Replace flooring/tile
– Replace lighting
– Replace sink and faucet
– Reconnect all appliances
– Replace trim as needed
– Paint
Kitchen Renovation
A kitchen renovation starts between $50,000-$90,000.
The project length is typically 5-7 weeks.
-Demo to a white box state (only dry wall remaining)
– Removal of walls (non-loadbearing and loadbearing)
– Major movement of existing layout
– Added blocking for all cabinets
– Replace cabinets (high end lines, customizable doors/colors, crown molding)
– Replace countertops (high end, group 6-8 quartz, quarzite, marble)
– Waterfall countertop for islands
– Full stone backsplash
– Under cabinet lights
– Cup rinser, RO system, Pot filler
– Replace trim
– Wall paneling, accent wall, wainscotting, faux beams, crown molding
– 3D drawings
– Work with designer
Room Addition
A room addition starts between $70,000-130,000.
The project length is typically 2-3 months.
– Includes permitting and planset
– Pre-planning process (brainstorming, value engineering, preparation for a
seamless experience and project)
– Communication every day from GC or PM
– Price can vary widely!!!
Basic Deck Build
A basic deck build starts between $6000-$15,000.
The project length is typically 1-2 weeks.
– All treated lumber
– Horizontal or vertical deck lay
– Wood railing and 3 steps
Advanced Deck Build
An advanced deck build starts between $13,000-$40,000.
The project length is typically 2-3 weeks.
– Treated lumber structure
– Concrete piles for posts
– Composite deck boards from Timbertech by Azek
– Picture frame deck/add designs
– Hidden fasteners
– Wood/aluminum railing
– Waterfall steps
Ultimate Deck Build
The ultimate deck build starts at $25,000 and price varies on custom features.
The project length is typically 2-4 weeks.
– Treated wood structure
– Concrete piles
– Advance PVC decking and skin from Timbertech by Azek
– Aluminum or PVC railing
– Waterfall steps
– Picture frame deck and accents
– Gas line, outlets, reinforcements for hot tubs/fireplaces/pits
Don't see the project you have in mind?
Go to our inquiry form and let us know what project you want for your home. We would be thrilled to help you work out the details.